Skip to content
Kitchen NV logo
Remodeled primary bathroom with a white oak double vanity, large-format porcelain tile and a frameless glass shower near Pinckney, MI

Kitchen NV services

Bathroom Remodeling in Pinckney, MI

Bathrooms drawn by a kitchen and bath designer, then built by trusted partner trades.

  • ★ 5.0 on Google (28 reviews)
  • MI Residential Builder #2101209269
  • CMKBD · CAPS · CLIPP designer
  • Serving since 2020

Bathroom remodeling in Pinckney, MI goes better when the person drawing the room also understands the drain lines, the exhaust duct and the waterproofing that will sit behind the tile. Kitchen NV works out of a small Hamburg Township studio, and owner Nick Vanderhovel plans a bathroom the way he plans a kitchen: measured drawings first, selections second, construction only after every decision is on paper.

We design the room and specify the vanity cabinetry, tile, fixtures and lighting; Nick then coordinates trusted partner contractors for plumbing, electrical, tile and glass, and stays involved until the last mirror is hung. Master baths are where many clients start, and powder rooms and shower-only jobs follow the same steps.

If a kitchen is also on your list, kitchen remodeling can be planned in the same design phase so finishes and schedules line up.

Which bathroom projects does Kitchen NV design?

Most bathroom work we take on falls into six project types, each with its own page:

Hall bathroom with a tiled tub alcove, painted navy vanity and hexagon floor tile in a Livingston County colonial
A hall bath that keeps its tub but gains a tiled alcove, a painted vanity and hexagon floor tile.

What you get: bathroom remodeling with Kitchen NV

  • Interview-style first consultation about how the bathroom is used
  • Site measurements and a dimensioned floor plan of the existing room
  • Layout options, 3D renderings and wall elevations for the new design
  • Tile layout drawings, including niche, bench and accent-band placement
  • Lighting and electrical plan, including heated floor and exhaust fan
  • Vanity and linen cabinetry design, ordering and delivery handling
  • Fixture, tile, countertop and hardware selections with samples
  • Written scope of work and coordination of partner contractors through install

Bathroom remodeling near Pinckney, MI: what local houses bring to the plan

Local houses shape the design before any tile is chosen. Lake homes and converted cottages on Strawberry, Zukey and Gallagher lakes in Hamburg Township often have bathrooms squeezed into old floor plans, with plumbing that was extended one fixture at a time. Many need new drain routing before a larger shower can work.

Across Genoa Township and Green Oak Township, the common starting point is a 1990s or 2000s colonial with a builder-grade primary bath: a corner whirlpool nobody uses, a cultured-marble vanity top and a fiberglass shower. That layout usually has room for a much better shower once the tub deck comes out.

Farther out, rural homes in Putnam Township and much of Hamburg run on private wells. Hard well water leaves mineral spotting on glass, dark polished stone and some faucet finishes, so we steer selections toward surfaces that hide or shed it, and we suggest asking a water treatment company about softening before the new glass goes in.

Lake cottage bathroom with beadboard wainscot, a walk-in shower and a window toward the water in Hamburg Township
A small lake-cottage bathroom rebuilt around a walk-in shower, with painted beadboard and a view toward the water.

Planning bathroom remodeling? Call Nick at (810) 923-8792

Call Kitchen NV in Pinckney, Monday to Friday, 9 a.m. to 5 p.m. Design consultations are by appointment.

  • ★ 5.0 on Google (28 reviews)
  • MI Residential Builder #2101209269
  • CMKBD · CAPS · CLIPP designer
  • Serving since 2020

What does a full bathroom remodel involve behind the walls?

A full bathroom remodel takes the room to the studs, and the hidden parts decide how long it lasts. We write them into the drawings so every partner trade prices the same job.

Waterproofing the shower

Cement board and grout are not waterproof on their own. Tiled showers need a membrane behind or under the tile, either a sheet membrane set in thinset, a liquid-applied membrane or a traditional mortar bed over a liner. Products tested to the ANSI A118.10 standard are rated as waterproof membranes, and the shower pan should be flood-tested before tile is set.

Orange waterproofing membrane on shower walls and a sloped pan during a flood test in a Livingston County bathroom remodel
A shower stall wrapped in sheet membrane, with the pan holding water during a flood test before tile.

Ventilation sized to the room

Michigan winters keep windows shut for months, so the exhaust fan carries the moisture load. The Home Ventilating Institute guideline is roughly one CFM per square foot for baths up to 100 square feet, with larger rooms sized by fixture count. The fan should be ducted outdoors, never into the attic, and a humidity-sensing control helps it run long enough.

Plumbing, electrical and heat

Moving a toilet or shower drain means cutting into floor framing, so we check joist direction before promising a new location. Bathroom outlets need GFCI protection, and a heated tile floor needs its own circuit. Showers get a pressure-balancing or thermostatic valve to prevent scalding when someone flushes elsewhere in the house.

“Nick has been my go to kitchen and bath guy for years. His designs are second to none and his quality in service and knowledge of the industry is unrivaled. I wouldn't consider going anywhere else to do a remodel because, I know with Nick and Kitchens NV, that I will get what I truly want and I will get it when promised and done correctly. Remodel Guru would be putting it lightly, what a great company, in a time where it can be hard to find someone to trust with your home. ”
— Trevor L., Google review ★★★★★

How much does a bathroom remodel cost in Michigan?

We do not publish package prices, because two same-size bathrooms can differ widely once the scope is drawn. These are the decisions that move the number:

Common cost drivers in a bathroom remodel
DecisionWhy it changes the budget
Moving drains or the toiletFloor framing, venting and inspection work increase with every relocated fixture.
Tile size, pattern and coverageFloor-to-ceiling tile, herringbone or mosaics add material and installer hours.
Shower glassFrameless glass is measured after tile and fabricated to fit, which adds cost and lead time.
Vanity constructionCustom sizes, furniture-grade boxes and inset doors cost more than stock widths.
Curbless entryRecessing the shower floor can mean reframing joists or cutting a slab.
Condition behind the wallsOld water damage, undersized drains or ungrounded wiring are found at demolition.

For published third-party figures and a longer look at local factors, read our guide to bathroom remodel costs in Ann Arbor and Brighton.

Bathroom tile, quartz and brass faucet samples laid out on a dining table for a Pinckney bathroom remodel
Tile, countertop and fixture finish samples gathered on a dining table for side-by-side comparison.

Who permits a bathroom remodel in Livingston County, and under whose license?

Michigan's Occupational Code sets the licensing floor: MCL 339.2403 applies to any paid home job of $600 or more, nearly every bathroom remodel, and calls for a residential builder license or a maintenance-and-alteration contractor license. Nick's individual builder license is #2101209269. Plumbing sits under the Skilled Trades Regulation Act, where MCL 339.6107 lets owners plumb their own single-family home only with a permit.

Around Pinckney, most townships send building and trade permits through the county office in Howell once any local zoning step is done: the village land use permit inside Pinckney, zoning compliance in Putnam Township. Howell's city limits and Green Oak keep their own offices, so check with your township before demolition is booked.

Bathroom design that plans for aging in place

Nick holds the CAPS credential from the National Association of Home Builders and CLIPP certification from the Living in Place Institute, so safety comes up early in every bath we draw: wall blocking for future grab bars, a low shower threshold, a bench at seat height and lever handles. Planned from the start, these read as design rather than equipment.

For homeowners planning to stay for decades, our aging-in-place remodeling page and the dedicated accessible bathroom remodel page cover clear floor space, curbless showers and comfort-height fixtures in more depth.

Low-threshold tiled shower with a floating teak bench and brushed nickel grab bar in a Michigan ranch bathroom
A low-threshold shower with a fold-down teak bench, a grab bar and a handheld spray on a slide bar.

How a Kitchen NV bathroom remodel runs from first meeting to final fixture

  1. Consultation

    Nick interviews you about the room: who uses it, at what hour, what fails today and what you want to keep. We look at photos of the existing space and talk through scope before any fee.

  2. Design retainer and measure

    A design retainer starts the work. Nick measures the room, notes joist direction, window heights and the vent route, and drafts the existing floor plan.

  3. Layouts, renderings and pricing

    You review layout options in 3D, then elevations and technical drawings for the chosen plan, followed by a pricing presentation for cabinetry and materials.

  4. Selections

    Tile, vanity tops, plumbing fixtures, lighting, mirrors and hardware are chosen with samples, hourly or as a package.

  5. Ordering

    After the purchase agreement, Kitchen NV orders and handles the vanity cabinetry and tracks lead times so the bathroom is not torn out while you wait on parts.

  6. Construction with partner contractors

    Nick introduces and coordinates trusted partner contractors for plumbing, electrical, tile and glass, and checks in on site through installation.

Why Pinckney-area homeowners bring their bathroom plans to Nick

A bath credential, not only a kitchen one

Nick's CMKBD credential from the NKBA (Certified Master Kitchen & Bath Designer) covers bath planning as fully as kitchens: clearances, ventilation and fixture layout.

Cabinetry is the specialty

Vanities, linen towers and medicine cabinets are cabinetry, which is the core of what Kitchen NV designs and orders; see our kitchen cabinets page for how that work is handled.

Licensed and hands-on

The Michigan residential builder license (#2101209269) is in Nick's own name, and a short client list keeps him on every job.

Reviewed on master baths

Homeowners have described Nick's help with their master bathroom remodels in Google reviews, and the studio holds a 5.0 rating across 28 of them.

Warranty coverage on cabinetry, countertops, fixtures and installation comes from each manufacturer and the installing contractor; you receive their written terms before anything is ordered.

Where we work

We design bathrooms throughout Livingston and Washtenaw counties from our Hamburg Township studio, including the newer subdivisions of Marion Township along D-19, older cottages ringing Whitmore Lake in Northfield Township, and early homes near downtown Brighton. Most first meetings happen in your home, where Nick can see the room and its plumbing access.

  • Hamburg Township, MI

    Our home township, where converted cottages on Strawberry and Zukey lakes often hide undersized drains.

  • Pinckney, MI

    Main Street homes and Portage Lake houses often rely on one cramped full bath worth rebuilding.

  • Genoa Township, MI

    1990s colonials near Lake Chemung still have builder-grade primary baths with corner whirlpools and cultured-marble tops.

  • Green Oak Township, MI

    Lake cottages and US-23 subdivisions alike, with bathroom permits through Green Oak's own building department.

  • Putnam Township, MI

    Private wells across rural Putnam leave hard-water spotting that steers our glass and fixture finish choices.

  • Marion Township, MI

    Post-2000 subdivisions along D-19 are reaching the age for their first primary bath and hall bath updates.

  • Northfield Township, MI

    Older Whitmore Lake cottages often need freeze-protected supply lines before a walk-in shower makes sense.

  • Brighton, MI

    Small baths under sloped ceilings near the Mill Pond, and tired 1990s baths in Grand River subdivisions.

  • Ann Arbor, MI

    Burns Park and Old West Side bathrooms bring plaster walls, cast-iron drains and narrow doorways that shape the plan.

Bathroom Remodeling services we design and manage

Client reviews

Clients on Nick’s bathroom remodeling work

★ 5.0 average from 28 Google reviews

★★★★★
“It was an absolute pleasure to work with Nick on our Master Bathroom remodel. Nick is in touch with the latest design trends and was very helpful and patient as we navigated the design process. He was always prepared and very professional. More ”
Scott A.Google review · 5 years ago (as of Nov 2026)
★★★★★
“Nick was very helpful with designing our master bath, and provided lots of input. We utilized his opinion as we picked out the fixtures, wood, colors, and it came out great More ”
Richard L.Google review · 5 years ago (as of Nov 2026)
★★★★★
“Nick has been my go to kitchen and bath guy for years. His designs are second to none and his quality in service and knowledge of the industry is unrivaled. I wouldn't consider going anywhere else to do a remodel because, I know with Nick and Kitchens NV, that I will get what I truly want and I will get it when promised and done correctly. Remodel Guru would be putting it lightly, what a great company, in a time where it can be hard to find someone to trust with your home. ”
Trevor L.Google review · 5 years ago (as of Nov 2026)

Bathroom Remodeling: answers before you start

How much does a bathroom remodel cost in Livingston County?

It depends mostly on scope: moving drains, tile coverage, custom glass and vanity construction drive the total more than square footage does. Kitchen NV does not quote package prices; we price your bathroom from the drawings during the pricing presentation, so you see what each decision adds before anything is ordered. Our cost guide covers third-party figures for the Ann Arbor and Brighton market.

How long will we be without the bathroom?

Plan on several weeks for a full remodel, with the partner contractor setting the real dates once the scope is final. We shorten the outage by ordering vanities and fixtures before demolition, so the room is not open while parts are on backorder. Frameless glass is measured after tile, which adds a short wait at the end; a temporary curtain bridges that gap.

Can you design a bathroom remodel at the same time as the kitchen?

Yes, and it often saves effort. Nick draws both rooms in one design phase, pulls samples for both at once and lines up the same partner trades, so plumbers make fewer trips. Build order depends on which room the household can live without; our article on whether to remodel the kitchen or bathroom first walks through that choice.

Do you handle permits for plumbing changes?

The licensed trade doing the work pulls the permit for it: in Michigan, plumbing permits are generally issued to licensed plumbing contractors, and electrical permits to licensed electricians. Nick lists every required permit in the scope of work so nothing is missed. The Livingston County Building Department in Howell covers most townships here, but some communities run their own department, so we confirm yours early.

Do you remodel bathrooms in lake cottages on the Huron River chain?

Yes. Converted cottages around Strawberry, Zukey and Gallagher lakes sit minutes from our Kress Road studio and bring familiar issues: undersized drains, crawlspace pipes exposed to freezing and out-of-level floors. Nick records those at the first visit, and the partner plumber confirms drain sizing and freeze protection before demolition.

Who provides the warranty on a remodeled bathroom?

Each manufacturer covers its own product, and the installing contractor covers the workmanship; there is no single blanket policy. You receive the written terms for the vanity, faucets, valves and other major items before we place any order, plus the partner contractor's installation terms, so you know who to call for each part of the room.

Tell Nick about your project

Prefer to talk? Call (810) 923-8792. Fields marked * are required.

Related services

From the Kitchen NV blog

Ready to plan your bathroom remodeling?

Call Kitchen NV in Pinckney, Monday to Friday, 9 a.m. to 5 p.m. Design consultations are by appointment.

  • ★ 5.0 on Google (28 reviews)
  • MI Residential Builder #2101209269
  • CMKBD · CAPS · CLIPP designer
  • Serving since 2020
Call (810) 923-8792Request design